Dartford, Kent
As part of a new commercial development we were approached to provide the necessary electricity infrastructure required to supply the new facility.
Liaising with UK Power Networks we ascertained the point of connection to their 11kV network and produced full electrical designs to include a new 500kVA high voltage secondary substation, which was subsequently adopted by an IDNO.
Working with the client through various challenges during both the design and construction phase, largely due to space constraints we were able to install and connect the new supply on time and to budget.